Rashin to Korti ADB Project - EPC 10B (Nagar Solapur Border)

Rashin to Korti ADB Project - EPC 10B (Nagar Solapur Border)

Rashin to Korti EPC 10B road

Project Details

Project Details

Principal Employer

Public Works Department, Maharashtra (Asian Development Bank Scheme).

Principal Features

Improvement of SH 68 Road from Siddhatek (Pune District Border) to Korti (Solapur District Border), Reconstruction, Widening and Strengthening of existing carriageway in the section of SH-68 from Km 127/200 to Km 136/890 & Km 0/000 to 0/420 Near Rashin Temple Bypass (Total Length- 10.110 Km) to two lanes with paved shoulders standards in Tal. Karjat Dist. Ahilyanagar, Maharashtra on Engineering, Procurement & Construction (EPC) Mode

Project Status

Completed

Rashin–Korti EPC 10 ADB-funded PQC road project was recognized as Maharashtra’s Best Road by the PWD on Engineer’s Day, September 2026.

View Utkrushta Rasta Puraskar 2025–26 certificate

Name of the Project

Name of the Project

EPC 10B

Gallery

Gallery

Rashin to Korti EPC 10B project team

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders