Sr. NoDescriptionQtyUnit
AEarth Work Bill No-02
1Clearing and grubbing for road land complete as per Technical Specification Clause 201180.37Hect
2Roadway excavation necessary for construction of roadway and drainage includes dressing, trimming and compacting the cut formation in accordance with requirements of lines, grades and cross fall complete as per Technical Specification section 301 and disposal of all cut material including necessary stacking of suitable material with all lifts and leads.
a)All types of Soils12,04,974Cum
d)Excavation for roadway in hard rock requiring controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of all cut material including necessary stacking of suitable material with all lifts and leads complete as per Technical Specification Section 301 & 30214,80,203Cum
3Construction of embankment complete as per technical specification clause 305 with all leads and lifts.
b)Embankment with suitable materials deposited at site from roadway and drainage excavation
From roadway excavation14,11,578Cum
From Borrow Area38,04,044Cum
4Construction of subgrade complete as per drawing and technical specification clause 305 with all leads and lifts.
a)Subgrade with approved material obtained from approved borrow areas3,33,612Cum
5Providing and Construction of Granular Sub-base (Grade VI) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.1,48,015Cum
6Providing and Construction of Cement Treated base with approved material complete as per MORTH Technical Specification Clause No. 40669,969Cum
7Providing and Construction of wet mix macadam (WMM) base with approved material complete as per MORTH Technical Specification Clause No. 40613,732Cum
8Providing and Construction of Aggregate Interlocking Layer (AIL) with approved material complete as per MORTH Technical Specification Clause No. 40635,260Cum
9Providing and Construction of Cement Treated Sub-base(Grade IV) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.CTSB47,353Cum
BPAVING COURSES
1Providing and laying Prime coat over granular surface as per drawing and technical specifications.4,80,435SQM
2Providing and applying bituminous Tack coat @ 2.0 to 3.0 kg /10 sqm over prepared bituminous surface with bituminous emulsion all complete as per Technical Specification Clause 5037,64,830SQM
3Providing and laying Dense Bituminous Macadam (DBM with VG-40, grading-2) course complete as per MoRTH Technical Specification Clause Nos 501 & 505.28,826Cum
4Providing and laying Bituminous Concrete wearing course using VG-40 grade Bitumen, Grading I as per drawing and Technical Specification Clause No. 507.11,375Cum
CCULVERTS
1Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means40,865Cum
2Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M152,861.5Cum
3Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. RCC M3016,464Cum
4Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16002,617MT
5Providing and Laying Reinforced cement concrete for Box / Slab culverts in Superstructure excluding cost of steel complete as per drawing and Technical Specifications Sections 1500, 1700 and 2300.
a)RCC Grade M 305,305Cum
DBRIDGES
1Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a)In all types of Soils by mechanical means44,159Cum
2Providing and laying Cement Concrete for foundation excluding cost of steel complete as per Drawings and Technical Specifications Section 1500,1700 and 2100 PCC M152,178Cum
3Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
b) M308,396cum
b) M353,807cum
4Providing and laying Cement Concrete in sub-structure including centering and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 & 2200.(Excluding cost of steel).
a) RCC M303,776cum
b) RCC M353,801cum
d) RCC M40260cum
d) RCC M45322cum
5Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M301,765cum
b) RCC M354,927cum
d) RCC M401,821cum
d) RCC M451,717cum
6Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16003,558MT
EUnderpasses
1Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means33,733Cum
2Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M151,853Cum
3Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
a)RCC M302,868cum
b)RCC M351,871cum
4Providing and laying Cement Concrete in sub-structure including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
b) RCC M302,259cum
c) RCC M352,202cum
5Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M30953cum
b) RCC M352,353cum
c) RCC M401,207cum
d) RCC M45, Cast in situ2,774cum
6Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16002,026MT
FOther Work
1Providing and construction of Toe wall complete as per the drawings and Technical Specifications 1500, 1600,1700, 2100 & 2200 as directed by the Engineer.
a) Excavation in all types of soil88,085Cum
b) PCC M 15 using batching plant1,716Cum
c) RCC Grade M 30 for foundation13,924Cum
e) Reinforcement1,410MT
2Re Panel Erection8,675SQM
3RE wall Panel Casting15,086SQM
4Boundry wall Panel Erection22,000RMT
5Road side drains (Shoulder drain,Linne drain,Unline Drain)27,302RMT
6Geocell & turfing on Slope protection1,22,800RMT
7Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 81043,390RMT
8Providing and constructing RCC crash barrier M-40 grade including cost of centering, shuttering and reinforcement as per approved Drawings and Technical Specifications 811,1500, 1600, 1700 and as per IRC-6.1,105RMT
9Chute Drain3,462RMT
10Water pipe line (Utility Pipe)760RMT
11'Providing and constructing Geo-composite behind abutments, wing walls, retaining walls and return walls complete as per Drawings and Technical Specifications.49,400RMT
12Providing, planting and maintaining the avenue plantation and median plantation as per Specifications7.432KM
13Geogride Laying on (SG Top layer & GSB Top )1,65,000SQM

Back to Package 3

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders