NH-544G · PACKAGE 3← Back To Projects

NH-544G / PACKAGE 3

Physical Progress — August 2024

Physical Progress — August 2024

Package 3 | Monthly progress report — August 2024.

Scroll the table horizontally to view all columns on smaller screens.

Sr. NoDescriptionQtyUnit
1Clearing and grubbing for road land complete as per Technical Specification Clause 201112.37Hect
2Roadway excavation necessary for construction of roadway and drainage includes dressing, trimming and compacting the cut formation in accordance with requirements of lines, grades and cross fall complete as per Technical Specification section 301 and disposal of all cut material including necessary stacking of suitable material with all lifts and leads.
a) All types of Soils3,94,573Cu m
d) Excavation for roadway in hard rock requiring controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of all cut material including necessary stacking of suitable material with all lifts and leads complete as per Technical Specification Section 301 & 30246,689Cu m
3Construction of embankment complete as per technical specification clause 305 with all leads and lifts.
b) Embankment with suitable materials deposited at site from roadway and drainage excavationCu m
From roadway excavation3,54,056Cu m
From Borrow Area10,01,407Cu m
CULVERTS
4Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means6,665Cu m
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M15932.6Cu m
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. RCC M305,425Cu m
Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 1600355MT
Providing and Laying Reinforced cement concrete for substructure excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2200.
a) RCC Grade M 2542Cu m
BRIDGES
5Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means9,859Cu m
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M15837Cu m
Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel) M306,695Cu m
Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel) M351,540Cu m
Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 1600475MT
Underpasses
5Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means2,833Cu m
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M15289Cu m
Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel) M301,738Cu m
Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel) M35527Cu m
Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 160018MT
Providing and laying Cement Concrete in sub-structure including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
5g.2Providing and construction of Toe wall complete as per the drawings and Technical Specifications 1500, 1600,1700, 2100 & 2200 as directed by the Engineer.
a) Excavation in all types of soil1,100CUM
b) PCC M 15 using batching plant60CUM
c) RCC Grade M 30 for foundation249CUM

Back to Package 3

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders