NH-544G · PACKAGE 3← Back To Projects

NH-544G / PACKAGE 3

Physical Progress — October 2025

Physical Progress — October 2025

Package 3 | Monthly progress report — October 2025.

Scroll the table horizontally to view all columns on smaller screens.

Sr. NoDescriptionQtyUnit
Earth Work Bill No-02
1Clearing and grubbing for road land complete as per Technical Specification Clause 201178.37Hect
2Roadway excavation necessary for construction of roadway and drainage includes dressing, trimming and compacting the cut formation in accordance with requirements of lines, grades and cross fall complete as per Technical Specification section 301 and disposal of all cut material including necessary stacking of suitable material with all lifts and leads.
a)All types of Soils1,204,974Cum
d)d) Excavation for roadway in hard rock requiring controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of all cut material including necessary stacking of suitable material with all lifts and leads complete as per Technical Specification Section 301 & 302963,789Cum
3Construction of embankment complete as per technical specification clause 305 with all leads and lifts.
b)Embankment with suitable materials deposited at site from roadway and drainage excavationCum
From roadway excavation1,141,417Cum
From Borrow Area3,282,723Cum
4Construction of subgrade complete as per drawing and technical specification clause 305 with all leads and lifts.
a)Subgrade with approved material obtained from approved borrow areas317,612Cum
5Providing and Construction of Granular Sub-base (Grade VI) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.1,08,347Cum
6Providing and Construction of Cement Treated base with approved material complete as per MORTH Technical Specification Clause No. 40649,388Cum
7Providing and Construction of wet mix macadam (WMM) base with approved material complete as per MORTH Technical Specification Clause No. 40613,732Cum
8Providing and Construction of Aggregate Interlocking Layer (AIL) with approved material complete as per MORTH Technical Specification Clause No. 40630,302Cum
9Providing and Construction of Cement Treated Sub-base(Grade IV) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.CTSB25,337Cum
PAVING COURSES
Providing and laying Prime coat over granular surface as per drawing and technical specifications.320,940SQM
Providing and applying bituminous Tack coat @ 2.0 to 3.0 kg /10 sqm over prepared bituminous surface with bituminous emulsion all complete as per Technical Specification Clause 503318,440SQM
Providing and laying Dense Bituminous Macadam (DBM with VG-40, grading-2) course complete as per MoRTH Technical Specification Clause Nos 501 & 505.25,019Cum
CULVERTS
6Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.Cum
a) In all types of Soils by mechanical means25,865Cum
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M152,486.7Cum
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. RCC M3014,174Cum
Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16002,137MT
Providing and Laying Reinforced cement concrete for Box / Slab culverts in Superstructure excluding cost of steel complete as per drawing and Technical Specifications Sections 1500, 1700 and 2300.
a)RCC Grade M 305,120Cum
BRIDGES
7Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a)In all types of Soils by mechanical means40,159Cum
a)Providing and laying Cement Concrete for foundation excluding cost of steel complete as per Drawings and Technical Specifications Section 1500,1700 and 2100 PCC M152,036Cum
a)Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
b) M308,051cum
b) M353,711cum
Providing and laying Reinforced Cement Concrete in sub-structure including centering and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 & 2100.(Excluding cost of steel).
a) RCC M303,483cum
b) RCC M353,789cum
d) RCC M40251cum
d) RCC M45322cum
Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M301,617cum
b) RCC M354,665cum
d) RCC M401,145cum
d) RCC M451,691cum
Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16003,282MT
Underpasses
8Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means29,733Cum
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M151,778Cum
b)Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
a)RCC M302,759cum
b)RCC M351,746cum
Providing and laying Cement Concrete in sub-structure including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
b) RCC M302,050cum
c) RCC M351,978cum
Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M30887cum
b) RCC M351,480cum
b) RCC M40651cum
d) RCC M45, Cast in situ2,483cum
Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16001,826MT
Other Work
10Providing and construction of Toe wall complete as per the drawings and Technical Specifications 1500, 1600,1700, 2100 & 2200 as directed by the Engineer.
a) Excavation in all types of soil51,085Cum
b) PCC M 15 using batching plant1,532Cum
c) RCC Grade M 30 for foundation10,966Cum
e) Reinforcement1,112MT
11Re Panel Erection8,675SQM
12RE wall Panel Casting15,086SQM
13Boundry wall Panel Erection10,356RMT
14Road side drains (Shoulder drain,Linne drain,Unline Drain)21,770RMT
15Geocell & turfing on Slope protection32,788RMT
16Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 8109,130RMT
17Providing and constructing RCC crash barrier M-40 grade including cost of centering, shuttering and reinforcement as per approved Drawings and Technical Specifications 811,1500, 1600, 1700 and as per IRC-6.473RMT
18Chute Drain2,462RMT
19Water pipe line (Utility Pipe)760RMT
20'Providing and constructing Geo-composite behind abutments, wing walls, retaining walls and return walls complete as per Drawings and Technical Specifications.45,400RMT
21Providing, planting and maintaining the avenue plantation and median plantation as per Specifications6.349KM
14Geogride Laying on (SG Top layer & GSB Top )165,000SQM

Back to Package 3

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders