Sr. NoDescriptionQtyUnit
Earth Work Bill No
1Clearing and grubbing for road land complete as per Technical Specification Clause 201129Hect
a) Girth from 300 mm to 600 mmNo
b) Girth from 600 mm to 900 mmNo
c) Girth from 900 mm to 1800 mmNo
d) Girth above 1800 mmNo
2Roadway excavation necessary for construction of roadway and drainage includes dressing, trimming and compacting the cut formation in accordance with requirements of lines, grades and cross fall complete as per Technical Specification section 301 and disposal of all cut material including necessary stacking of suitable material with all lifts and leads.
a)All types of Soils2,928,897Cum
d)Excavation for roadway in hard rock requiring controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of all cut material including necessary stacking of suitable material with all lifts and leads complete as per Technical Specification Section 301 & 302828,188Cum
3Construction of embankment complete as per technical specification clause 305 with all leads and lifts.
b)Embankment with suitable materials deposited at site from roadway and drainage excavationCum
From roadway excavation2,010,730Cum
From Borrow Area340,065Cum
4Construction of subgrade complete as per drawing and technical specification clause 305 with all leads and lifts.
a)Subgrade with approved material obtained from approved borrow areas374,303Cum
5Providing and Construction of Granular Sub-base (Grade VI) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.66,813Cum
Providing and Construction of CTB with approved material complete as per MORTH Technical Specification Clause No. 406 (WMM)13,588Cum
Providing and Construction of Aggregate Interlocking Layer (AIL) with approved material complete as per MORTH Technical Specification Clause No. 40612,717Cum
CTSB on Earthen Shoulder10,438Cum
PAVING COURSES
Providing and laying Prime coat over granular surface as per drawing and technical specifications.185,150SQM
Providing and applying bituminous Tack coat @ 2.0 to 3.0 kg /10 sqm over prepared bituminous surface with bituminous emulsion all complete as per Technical Specification Clause 503185,150SQM
Providing and laying Dense Bituminous Macadam (DBM with VG-40, grading-2) course complete as per MoRTH Technical Specification Clause Nos 501 & 505.12,483Cum
CULVERTS
6Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.Cum
a) In all types of Soils by mechanical means27,789Cum
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M152,444Cum
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. RCC M3015,679Cum
Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16003,868MT
Providing and Laying Reinforced cement concrete for Box / Slab culverts in Superstructure excluding cost of steel complete as per drawing and Technical Specifications Sections 1500, 1700 and 2300.
a)RCC Grade M 3012,680Cum
BRIDGES
7Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.Cum
a)In all types of Soils by mechanical means19,502Cum
Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)855Cum
Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
a) M305,277cum
b) M35cum
Providing and laying Cement Concrete in sub-structure including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
b) RCC M306,374cum
c) RCC M35cum
Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M306,411cum
b) RCC M35cum
b) RCC M40cum
d) RCC M45cum
Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16002,781MT
Underpasses
8Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means7,379Cum
Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M15242Cum
b)Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
a)RCC M30cum
b)RCC M352,833cum
Providing and laying Cement Concrete in sub-structure including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
b) RCC M30cum
c) RCC M351,308cum
Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M30cum
b) RCC M35354cum
b) RCC M40601cum
d) RCC M45, Cast in situ1,202cum
Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 1600260MT
Other Work
10Providing and construction of Toe wall complete as per the drawings and Technical Specifications 1500, 1600,1700, 2100 & 2200 as directed by the Engineer.
a) Excavation in all types of soil8,369Cum
b) PCC M 15 using batching plant951Cum
c) RCC Grade M 30 for foundation8,363Cum
e) Reinforcement394MT
11Re Panel Erection7,026SQM
12RE wall Panel Casting11,887SQM
13Boundry wall Panel Erection5,431RMT
14Road side drains (Shoulder drain,Linne drain,Unline Drain)13,250RMT
15Geocell & turfing on Slope protection4.50RMT
16Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 81015,763RMT
17Providing and constructing RCC crash barrier M-40 grade including cost of centering, shuttering and reinforcement as per approved Drawings and Technical Specifications 811,1500, 1600, 1700 and as per IRC-6.100RMT
18Chute Drain1,450RMT
19Water pipe line (Utility Pipe)1,760RMT
20Providing and constructing Geo-composite behind abutments, wing walls, retaining walls and return walls complete as per Drawings and Technical Specifications.10,000RMT
21Providing, planting and maintaining the avenue plantation and median plantation as per Specifications4.50RMT
22Retaining wall700RMT

Back to Package 2

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders