NH-544G · PACKAGE 2← Back To Projects

NH-544G / PACKAGE 2

Physical Progress

Physical Progress

Excel report as on 31 March 2026. Quantities, units, rates, amounts and progress percentages are reproduced from the supplied workbook. Monthly reports from May 2024 to April 2026 are available below.

Scroll the table horizontally to view all columns on smaller screens.

Upto 31.03.2026

S.NoDescriptionQtyUnitRateAmount
AEarth work Bill no-02
1Clearing and grubbing for road land complete as per Technical Specification Clause 201143Hect30,81144,06,016
2Roadway excavation necessary for construction of roadway and drainage includes dressing, trimming and compacting the cut formation in accordance with requirements of lines, grades and cross fall complete as per Technical Specification section 301 and disposal of all cut material including necessary stacking of suitable material with all lifts and leads.
a) All types of Soils29,54,237Cum9026,65,60,823
d) Excavation for roadway in hard rock requiring controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of all cut material including necessary stacking of suitable material with all lifts and leads complete as per Technical Specification Section 301 & 30212,60,376Cum30838,83,34,542
3Construction of embankment complete as per technical specification clause 305 with all leads and lifts.
b) Embankment with suitable materials deposited at site from roadway and drainage excavation
From roadway excavation20,58,996Cum9719,95,37,265
From Borrow Area5,94,917Cum24914,82,71,201
4Construction of subgrade complete as per drawing and technical specification clause 305 with all leads and lifts.
a) Subgrade with approved material obtained from approved borrow areas3,32,647Cum2498,29,06,851
5Providing and Construction of Granular Sub-base (Grade VI) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.1,03,519Cum1,07811,16,37,572
6Providing and Construction of Cement Treated base with approved material complete as per MORTH Technical Specification Clause No. 40660,500Cum1,97811,96,89,451
6Providing and Construction of wet mix macadam (WMM) base with approved material complete as per MORTH Technical Specification Clause No. 40614,061Cum1,6052,25,70,787
7Providing and Construction of Aggregate Interlocking Layer (AIL) with approved material complete as per MORTH Technical Specification Clause No. 40635,629Cum1,6055,71,91,847
8Providing and Construction of Cement Treated Sub-base(Grade IV) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.CTSB30,648Cum1,8025,52,27,471
BPAVING COURSES
1Providing and laying Prime coat over granular surface as per drawing and technical specifications.3,84,140SQM491,89,09,292
2Providing and applying bituminous Tack coat @ 2.0 to 3.0 kg /10 sqm over prepared bituminous surface with bituminous emulsion all complete as per Technical Specification Clause 5033,84,140SQM1452,43,511
3Providing and laying Dense Bituminous Macadam (DBM with VG-40, grading-2) course complete as per MoRTH Technical Specification Clause Nos 501 & 505.16,545Cum9,85716,30,77,411
4Providing and applying bituminous Tack coat @ 2.0 to 3.0 kg /10 sqm over prepared bituminous surface with bituminous emulsion all complete as per Technical Specification Clause 5033,81,640SQM1452,09,386
5Providing and laying Dense Bituminous Macadam (BC with CRMB-60, grading-2) course complete as per MoRTH Technical Specification Clause Nos 501 & 505.15,246Cum11,568.8717,63,78,929
BSlip Road/Service Road & Toll plaza
1Construction of subgrade complete as per drawing and technical specification clause 305 with all leads and lifts.
a) Subgrade with approved material obtained from approved borrow areas12,252Cum24930,53,612
2Providing and Construction of Granular Sub-base (Grade VI) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.1,099Cum1,07811,85,194
3Providing and laying Dry lean cement concrete (DLC) as per Table 600-1of Technical Specification Clause 601 with a minimum cement content of 150kg/Cum324Cum2,157.836,99,138
4Providing un-reinforced, dowel jointed, Pavement Quality Concrete (PQC) of M40 grade concrete with minimum cement content of 400kg/Cum, including all costs of jointing, edge cutting, dowel bars etc., all complete as per drawing and Technical Specification Clause 6020Cum6,552.740
CCULVERTS
1Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means28,339Cum9727,46,372
2Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M153,095Cum4,5771,41,63,496
3Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. RCC M3019,644Cum5,86911,52,79,766
4Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16004,118MT75,71931,18,45,549
5Providing and Laying Reinforced cement concrete for Box / Slab culverts in Superstructure excluding cost of steel complete as per drawing and Technical Specifications Sections 1500, 1700 and 2300.
a) RCC Grade M 3013,263Cum7,2869,66,33,745
DBRIDGES
1Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means19,502Cum11321,99,676
2Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M151,455Cum4,57766,58,147
3Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
a) RCC M305,413Cum5,8693,17,66,353
b) RCC M351,926Cum6,0251,16,04,535
4Providing and laying Cement Concrete in sub-structure including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
b) RCC M306,439Cum6,5774,23,51,832
c) RCC M351,910Cum6,7341,28,61,674
5Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M306,877Cum7,2865,01,04,779
b) RCC M35Cum7,4430
C) RCC M40Cum7,5960
d) RCC M45Cum14,4500
6Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16003,146MT75,71923,82,30,180
EUnderpasses
1Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means7,379Cum22,75116,78,88,729
2Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M152,114Cum1,07622,74,201
3Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
a)RCC M30Cum3,1310
b)RCC M353,738Cum5,9852,23,71,750
4Providing and laying Cement Concrete in sub-structure including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
b) RCC M3050Cum6,5773,28,859
c) RCC M351,866Cum6,7341,25,62,084
5Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M309Cum7,28665,573
b) RCC M35568Cum7,44342,29,808
C) RCC M401,009Cum7,59676,64,325
d) RCC M45, Cast in situ1,425Cum14,4502,05,91,706
6Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 1600665MT75,7195,03,45,107
FOther Work
1Providing and construction of Toe wall complete as per the drawings and Technical Specifications 1500, 1600,1700, 2100 & 2200 as directed by the Engineer.
a) Excavation in all types of soil10,869CUM9710,53,251
b) PCC M 15 using batching plant1,516CUM4,57769,37,576
c) RCC Grade M 30 for foundation10,179CUM5,8695,97,35,166
e) Reinforcement499MT75,7193,77,60,950
2Re Panel Erection14,913SQM5,0587,54,29,954
3RE wall Panel Casting14,913SQM29243,54,596
4Boundry wall Panel Erection7,100RMT1,8551,31,70,500
5Road side drains (Shoulder drain,Linne drain,Unline Drain)32,619RMT2,4558,00,91,926
6Geocell & turfing on Slope protection6,810.00RMT56438,38,797
5Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 81029,635RMT4,06712,05,28,259
6Providing and constructing RCC crash barrier M-40 grade including cost of centering, shuttering and reinforcement as per approved Drawings and Technical Specifications 811,1500, 1600, 1700 and as per IRC-6.1,259RMT6,68784,19,501
7Geogride laying on (SG Top layer & GSB Top)1,35,000SQM7297,20,000
8Filter Media2,325SQM72916,94,925
9Chute Drain3,056RMT1,71952,54,134
10Water pipe line (Utility Pipe)2,010RMT30,8116,19,30,712
11Providing and constructing Geo-composite behind abutments, wing walls, retaining walls and return walls complete as per Drawings and Technical Specifications.11,000RMT1,0671,17,37,175
12Providing, planting and maintaining the avenue plantation and median plantation as per Specifications10.60KM82,0818,70,059
13Retaining wall2,330RMT51,368.611,96,88,943
12HT/LT lines (including Transformers if any)900RMT30,749.02,76,74,100
80.32%3,70,47,49,068
100%4,61,23,00,000
Previou Month53.380%
This month26.943%

Additional worksheet values

CellValue
B1PACKAGE-02 Progress With BOQ Quantity As on 31.03.2026
P615340
O7315036.5
P740000
R91314
S910
T913140
R1010890
S106
T1065340
P1113140
H13304510
N13-28,137
H14101077.65599999999
N14-2,441
P1490068.125
H1555,650
N15-4,850
H1731,188
N17-4,441
H1822467.75000000001
N18-8,180
H20381640.00000000006
N20-2,500
H21381640.00000000006
N21-2,500
H2222701.000000000004
N226,156
R23381420
Q2444.87
S241cum
T24132KG
U245922.84
H27304510
N272,92,258
AA2711800
H28101077.65599999999
N2899,979
P2890068.125
X28tollplaza
Q29725
W29SG Top
X291180
W30GSB
X30590
A31BC/BS
W31DLC
X31324
H34699
N342,197
R3414996
H357103
N3518,789
R3742.57
H385429
A39MNB/MJB/ROB
H42710
O4378,599.36
H444795
H45277
P451419
H474896
P541958
A55LVUP/VUP
H61277
H64425
H669
H6740
H6855
P70612
S817897
H833,168.00
Q8429400
R8465200
Q89144000
Q9372.623
F980.726487354374543
Q100-2.960000000000008
F1017.67%
G10177.52%
G102-2.80%
Q10274.66%
F10469.55%
Q104-5.66%
F1073.10%

Sheet4

Worksheet values

CellValue
D4Geogride laying on (SG Top layer & GSB Top)
E469,000
F4SQM
G472
H449,68,000

Download original Excel workbook

Back to Package 2

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders