NH-544G · PACKAGE 2← Back To Projects

NH-544G / PACKAGE 2

Physical Progress — June 2024

Physical Progress — June 2024

Package 2 | Monthly progress report — June 2024.

Scroll the table horizontally to view all columns on smaller screens.

Sr. NoDescriptionQtyUnit
1Clearing and grubbing for road land complete as per Technical Specification Clause 20195.755Hect
2Roadway excavation necessary for construction of roadway and drainage includes dressing, trimming and compacting the cut formation in accordance with requirements of lines, grades and cross fall complete as per Technical Specification section 301 and disposal of all cut material including necessary stacking of suitable material with all lifts and leads.
a) All types of Soils3,40,497Cu m
3Construction of embankment complete as per technical specification clause 305 with all leads and lifts.
b) Embankment with suitable materials deposited at site from roadway and drainage excavationCu m
From roadway excavation3,19,387Cu m
From Borrow AreaCu m
4Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
EWa) In all types of Soils by mechanical means3,038Cu m
PCC M15Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M15140Cu m
RCC M30Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. RCC M30198Cu m
STEEL MTProviding, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 160045MT
4Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads. BRIDGES
EWa) In all types of Soils by mechanical means1,716Cum
PCC M15Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M1557Cum
4Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads. UNDERPASSES
EWa) In all types of Soils by mechanical means1,832Cum
PCC M15Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M1546Cum
RCC M30Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. RCC M35167Cum
STEEL MTProviding, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 160017MT

Back to Package 2

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders