NH-544G · PACKAGE 2← Back To Projects

NH-544G / PACKAGE 2

Physical Progress — November 2025

Physical Progress — November 2025

Package 2 | Monthly progress report — November 2025.

Scroll the table horizontally to view all columns on smaller screens.

Sr. NoDescriptionQtyUnit
AEarth Work Bill No-02
1Clearing and grubbing for road land complete as per Technical Specification Clause 201129Hect
2Roadway excavation necessary for construction of roadway and drainage includes dressing, trimming and compacting the cut formation in accordance with requirements of lines, grades and cross fall complete as per Technical Specification section 301 and disposal of all cut material including necessary stacking of suitable material with all lifts and leads.
a)All types of Soils29,58,897Cum
d)Excavation for roadway in hard rock requiring controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of all cut material including necessary stacking of suitable material with all lifts and leads complete as per Technical Specification Section 301 & 3029,43,188Cum
3Construction of embankment complete as per technical specification clause 305 with all leads and lifts.
b)Embankment with suitable materials deposited at site from roadway and drainage excavation
From roadway excavation20,75,730Cum
From Borrow Area4,45,065Cum
4Construction of subgrade complete as per drawing and technical specification clause 305 with all leads and lifts.
a)Subgrade with approved material obtained from approved borrow areas2,93,500Cum
5Providing and Construction of Granular Sub-base (Grade VI) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.83,464Cum
6Providing and Construction of CTB with approved material complete as per MORTH Technical Specification Clause No. 40645,394Cum
6Providing and Construction of wet mix macadam (WMM) base with approved material complete as per MORTH Technical Specification Clause No. 40613,968Cum
7Providing and Construction of Aggregate Interlocking Layer (AIL) with approved material complete as per MORTH Technical Specification Clause No. 40625,362Cum
8Providing and Construction of Cement Treated Sub-base(Grade IV) by Mix in Place method, complete as per drawing and Technical Specifications Clause 401.CTSB16,717Cum
BPAVING COURSES
1Providing and laying Prime coat over granular surface as per drawing and technical specifications.2,80,623SQM
2Providing and applying bituminous Tack coat @ 2.0 to 3.0 kg /10 sqm over prepared bituminous surface with bituminous emulsion all complete as per Technical Specification Clause 5032,80,623SQM
3Providing and laying Dense Bituminous Macadam (DBM with VG-40, grading-2) course complete as per MoRTH Technical Specification Clause Nos 501 & 505.15,642Cum
CCULVERTS
1Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means27,789Cum
2Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M153,044Cum
3Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. RCC M3019,079Cum
4Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16004,048MT
5Providing and Laying Reinforced cement concrete for Box / Slab culverts in Superstructure excluding cost of steel complete as per drawing and Technical Specifications Sections 1500, 1700 and 2300.
a)RCC Grade M 3013,180Cum
DBRIDGES
1Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a)In all types of Soils by mechanical means19,502Cum
2Providing and laying Cement Concrete in foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700,2100. PCCM155,855Cum
3Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
a) RCC M305,377cum
b) RCC M35cum
4Providing and laying Cement Concrete in sub-structure including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
b) RCC M306,424cum
c) RCC M35cum
5Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M306,561cum
b) RCC M35cum
b) RCC M40cum
d) RCC M45cum
6Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 16002,811MT
EUnderpasses
1Earthwork in excavation of foundation for structures complete as per drawing and Technical Specification Clause 304 with all lifts and leads.
a) In all types of Soils by mechanical means7,379Cum
2Providing and laying Cement concrete for foundations excluding cost of steel complete as per drawing and Technical Specifications Section 1500,1700, 2100. PCC M152,042Cum
3Providing and laying Cement Concrete in foundation including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2100 (Excluding cost of steel)
a)RCC M30cum
b)RCC M353,313cum
4Providing and laying Cement Concrete in sub-structure including centring and shuttering etc. as per Drawings and Technical Specifications Section 1500,1700 and 2200 (Excluding cost of steel)
b) RCC M30cum
c) RCC M351,308cum
5Providing and laying Reinforced Cement Concrete in Super structure complete as per Drawings and Technical Specifications Section 1700 & 2300.(Excluding cost of steel).
a) RCC M30cum
b) RCC M35354cum
b) RCC M40601cum
d) RCC M45, Cast in situ1,202cum
6Providing, cutting, bending and fixing in position of HYSD bar reinforcement in reinforced concrete structures complete as per drawing and Technical Specifications Section 1600348MT
FOther Work
1Providing and construction of Toe wall complete as per the drawings and Technical Specifications 1500, 1600,1700, 2100 & 2200 as directed by the Engineer.
a) Excavation in all types of soil8,369Cum
b) PCC M 15 using batching plant1,451Cum
c) RCC Grade M 30 for foundation9,363Cum
e) Reinforcement404MT
2Re Panel Erection13,970SQM
3RE wall Panel Casting14,124SQM
4Boundry wall Panel Erection6,621RMT
5Road side drains (Shoulder drain,Linne drain,Unline Drain)17.69RMT
6Geocell & turfing on Slope protection6,810.00RMT
5Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 81018.60RMT
6Providing and constructing RCC crash barrier M-40 grade including cost of centering, shuttering and reinforcement as per approved Drawings and Technical Specifications 811,1500, 1600, 1700 and as per IRC-6.240RMT
7Chute Drain2,056RMT
8Water pipe line (Utility Pipe)2,010RMT
9Providing and constructing Geo-composite behind abutments, wing walls, retaining walls and return walls complete as per Drawings and Technical Specifications.10,000RMT
10Providing, planting and maintaining the avenue plantation and median plantation as per Specifications4.50KM
11Retaining wall1,320RMT

Back to Package 2

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

Building the Nation, Beaming with pride

Registered Office

Amar Business Zone, C-Wing, Level 13, Baner,
Pune 411045, India

© 2026 Rajpath Infracon Pvt. Ltd. All rights reserved.

CRISIL A-/Stable · Guinness World Record Holders